Intake Queue

Every request from Rent Manager and ManageGo — one list, pre-triaged
Search… Automations live
Open today
34
Emergencies
2
▲ 1 new
Unassigned
7
Needs follow-up
3

This morning

Priorities suggested automatically — the coordinator can override any of them
No heat — 1178 E 229th St, Bronx · Apt 3C
ManageGo → Rent Manager · reported 7:42 AM
EMERGENCY7:42 AM
Leak under kitchen sink — 845 Lenox Rd, Brooklyn · Apt 2F
ManageGo → Rent Manager · reported 8:05 AM
HIGH8:05 AM
Lockout — 512 Rockaway Pkwy, Brooklyn · Apt 5A
Rent Manager portal · reported 8:31 AM
HIGH8:31 AM
Stove not lighting — 233 E 176th St, Bronx · Apt 1B
Office-created from a tenant call
ROUTINE9:10 AM
Bathroom ceiling stain — 1440 Sterling Pl, Brooklyn · Apt 4D
ManageGo → Rent Manager · reported 9:22 AM
ROUTINE9:22 AM
Requests from Rent Manager and ManageGo flow in automatically once Rent Manager API access is enabled; office-created jobs work from day one either way. Status writes back to Rent Manager, so it remains the system of record.
Job RL-2417 — No heat

Request

Unassigned
Building
1178 E 229th St, Bronx
Unit
Apt 3C
Category
Heat / hot water
Priority
Emergency (suggested)
Source
ManageGo → Rent Manager
Reported
Today, 7:42 AM
Tenant contact
On file
Tenant reports no heat since last night; radiator cold in every room.
92%
Priority confidence

✓ Assign as Emergency

A no-heat report routes as an emergency. Luis M. is on the Bronx route today with capacity before 11 AM.

Assignment is always a person's call — the queue suggests, the coordinator decides.

Lifecycle

Created
7:42 AM — from ManageGo via Rent Manager
✓ Done
Assigned
○ Pending
En route
○ Pending
On site
○ Pending
Done
○ Pending
Assigned

Lifecycle

Created
7:42 AM
✓ Done
Assigned
9:14 AM — scheduled 9:30–11:00
✓ Done
En route
● Active
On site
○ Pending
Done
○ Pending
Every transition is time-stamped and logged permanently; statuses cannot skip steps, so the record always tells the true story of the job.

Luis M. — Bronx3 jobs today

EMERGENCY
9:30 · No heat — 1178 E 229th St
11:30 · Stove — 233 E 176th St
2:00 · Radiator valve — 1975 Grand Concourse

Andre P. — Brooklyn4 jobs today

HIGH
9:00 · Leak — 845 Lenox Rd
11:00 · Lockout — 512 Rockaway Pkwy
1:30 · Ceiling stain — 1440 Sterling Pl
3:30 · Window latch — 289 Utica Ave

Sergey K. — Brooklyn2 jobs · on site from 1 PM

1:00 · Door frame — 622 Ocean Ave
3:00 · Mailbox lock — 98 Linden Blvd

Needs follow-upFlagged until closed

3rd visit
Recurring leak — 845 Lenox Rd, Apt 5B
The full build is a drag-to-assign day and week calendar per tech, with conflict warnings before a double-booking happens. This mockup shows the day view.
9:30 — No heat, 1178 E 229th St

Job RL-2417

En route
Scheduled
9:30–11:00 AM · tenant notified
Tech
Luis M.
Building
1178 E 229th St, Bronx · Apt 3C
Priority
Emergency
Source
ManageGo → Rent Manager
Reassigning is a drag on the calendar — the tenant automatically receives an updated time window.

Lifecycle

Created
7:42 AM
✓ Done
Assigned
9:14 AM
✓ Done
En route
9:21 AM — tenant notified
● Active
On site
○ Pending
Done
○ Pending

Luis M. — today's route

Runs in the phone's browser — nothing to install
9:30 — 1178 E 229th St, Apt 3C · No heat
EMERGENCY · tenant notified 9:30–11:00
● Active
11:30 — 233 E 176th St, Apt 1B · Stove not lighting
○ Pending
2:00 — 1975 Grand Concourse, Apt 6A · Radiator valve
○ Pending

Current job — RL-2417

Assigned
Building
1178 E 229th St, Bronx
Unit
Apt 3C
Access
Buzzer 3C · tenant home
History
2 prior jobs in this unit

✓ On the way

One tap sends the tenant an on-the-way notice and stamps the record.

Internal notes stay internal — tenants never see them.
En route

✓ Arrived at the building

Tapping on site stamps the arrival time. Closing the job asks for photos and a note.

Every job closes with photos — before and after — attached to the record permanently.
Job closed

Lifecycle

Created
7:42 AM
✓ Done
Assigned
9:14 AM
✓ Done
En route
9:21 AM
✓ Done
On site
9:44 AM
✓ Done
Done
10:36 AM — 2 photos, 1 note
✓ Done
Jobs imported
4,816
Customers
Imported
Records
Read-only
Search
Full-text

Imported job history

Sample rows — searchable by address, unit, category, or date
DateAddressCategoryStatus
2026-06-12845 Lenox Rd, BrooklynPlumbingCompleted
2026-04-031178 E 229th St, BronxHeat / hot waterCompleted
2026-02-18512 Rockaway Pkwy, BrooklynLocks & doorsCompleted
2025-11-301440 Sterling Pl, BrooklynRoof / leakCompleted
History imports from Service Fusion's standard report exports, which are available on every Service Fusion tier. Jobs arrive as searchable read-only records; file attachments do not export and remain in the Service Fusion archive.
Closed this month
704
Median completion
1.8 days
Emergencies
31
Reopened
6

Median time to complete, by priority

Emergency
4.1 hrs
High
1.3 days
Routine
3.2 days

Open jobs by building — top five

845 Lenox Rd, Brooklyn
6 open
1178 E 229th St, Bronx
4 open
1440 Sterling Pl, Brooklyn
3 open
233 E 176th St, Bronx
2 open
622 Ocean Ave, Brooklyn
2 open
Every report exports to CSV.
Interactive mockup · sample data